Waterford Energy

10341-1.d8b16717375f6926351a7afcf088f5354
Region
Midwest
Industry
Utilities
Tonnage
322 tons
Contractor
BHS

Waterford, OH
This 65,200 sq. ft. combined cycle plant was built in eastern Ohio. It was done in two phases. Phase 1 consisted of the installation and operation of three 160 megawatt gas fired combustion turbines, a 1,000 kW emergency generator, and a 290 kW emergency fire pump. Phase 2 included a 14-cell wet cooling tower, a gas-fired auxiliary boiler, a 100 kW back-up diesel generator, and a small 290 kW firewater pump.

PKM Steel Service, Inc. 228 E. Avenue A, Salina, KS 67401, p. 785-827-3638, f. 785-827-0400